RESIDENTIAL

Strathfield

Overview:

  • Client: Residential
  • Location: Strathfield, NSW
  • Project Date: Mid-2025
  • Duration: 1 week

Scope and Process:

Pre-Start Preparation:

Before work began, all project plans were thoroughly reviewed and distributed. Ibrahim managed the team to ensure everyone clearly understood their roles and responsibilities, enabling a seamless start. Steel deliveries—including reinforcement bars and pre-assembled cages—were carefully coordinated to arrive just in time for installation. Close communication was maintained with concreters, form workers, and site engineers to ensure smooth workflow and steel quality control.

Execution:

The project commenced with swift installation of bottom steel beams over the first 2 days, establishing a strong foundation. Following this, the top steel beams and rebar cages were precisely fixed in place, adhering strictly to engineering specifications and building codes. Supplementary structural supports were installed as required. The team worked efficiently within the constrained urban site, maintaining high safety and quality standards throughout.

Inspection:

A thorough inspection was carried out, leading to prompt engineering approval. The work was signed off on schedule, allowing immediate continuation with concrete pours without any rework or delay.

Outcome

The entire steel fixing scope was completed within one week, aligning perfectly with the client’s tight project timeline. Zero rework and full compliance ensured cost control and risk mitigation. Clear team management and precise execution resulted in high-quality reinforcement that supports long-term structural integrity. The client praised the team’s professionalism and efficiency, reinforcing trust for future projects.